Inforgraphic:The Production process of Tin Boxes
About the practical and durable Tin Box, Let’s take an infographic to closer look at details about the production process of the Tin Box Manufacturer

14 steps The production process of tin boxes.
Tin Box Design
Before designing Tins, we will discuss with the customer about shape, size, material inquiry, tin box application area, and printing design ideas. Then, we will arrange for an engineer to do a 3D drawing and handmade samples for the customer’s confirmation.
- Discuss with the customer about Determining the intended use of the tin (e.g., storage, gift packaging, food container).
- Research The shape and Style Dimensions and Specifications
- Tin Container Material Selection:
- Drawing 3D Drawing
- Tin Box Prototype made
- Feedback and Revisions
- Finalize Design to Prepare Open The Tin Box Mold
Open the mold
When the customer confirms the 3D drawing and Prototype samples, we will arrange to prepare the mould material to open the new mold.
- Confirm Design Mold Specifications
- Machining
- Testing the Mold
- Adjustments and Modifications
- Production Runs
- Maintenance
Make The Samples
After finishing the mold, we will prepare the samples for the customer to confirm.
- Printing samples
- Making samples
Confirm samples
After finishing the samples, we will send them to the customer to confirm whether everything is good.
- Send the samples to the customer
- Confirm the samples
Place order
After the customer confirms the samples, the customer places the order, and we will check all the information again.
- Confirm Tin Box Shape
- Confirm Tin Box Size
- Confirm Tin Box Design
- Confirm Samples
- Confirm Packing Details
- Confirm Shipping Ways
- Place Order
Material Sourcing
After checking all things, we will arrange the preparation material and packing materials.
- Confirm Material Requirements
- Confirm Material Size
- Get the Material Samples
- Confirm Material Samples
- Please Material order
- Control Material Quality
- Ship to Printing Factory
Printing
When the material arrives at the printing factory, we will recheck the confirmed samples, and compare the artwork, and material quality control.
- According to the Design Choose Printing Method
- Prepare Artwork and Confirm Design
- Apply Primer Coating
- Conduct Test Prints
- Print and Apply Protective Coating
- Quality Control
- High-temperature color fixation
- Ship to Factory
Sheet Cutting
When finishing printing,the material will ship to our factory, control the quality first and all things,after that will arrange the cutting.
- Check the tinplate Quality
- Comparison Machine
- Check the positioning line of the tinplate sheet
- Test Samples first
- Cutting all tinplate
Forming
After cutting the tinplate material, we will arrange to form the tin lid, tin box body and bottom.
- Prepare tin box Mold
- Installing the mold
- Test the mold
- Forming the first samples
- Confirm the first samples
- Forming orders
Assembly
After all the parts,we will prepare the packing material and accessories to assemble it.
- Prepare all Accessories
- Check the equipment
- Assembly product
Packing
After assembly, we will arrange clean tins,and prepare to pack it.
- Clean the Tin Box
- Control the quality of Tin Box
- Packing OPP or PE bag
- Packing Carton
Before Shipping Quality Control
After work,we will arrange random inspections of all goods to prepare shipping.
- Random inspection
Shipping
Before shipping, we will discuss with customers the shipping way and date.
- Arrange a Suitable shipping way
- Shipping
Distribution
When a customer receives all goods, they will prepare to pack inside goods or directly on the market on the shelf.
- Packing goods
- On Market Shelf to wait for Sell



Leave a Reply
Want to join the discussion?Feel free to contribute!